More exciting news these days than those US Navy InSurv classified documents policy changes of Dec '09...
The Harry S. Truman Carrier Strike Group deployed Friday from Norfolk Naval Station, Va., making this a big week in Navy News.
The morning of May 19 '10 began with replenishment-at-sea (RAS) with the fleet replenishment oiler USNS Kanawha (T-AO 196). An all crew effort pitched in a few members from the each of the various departments to help secure and store food supplies aboard the "Big -E".
Though everyone was ready to ship-out for a deployment in October '09 the USS Enterprise was laid up for an additional 7 months. A big shuffle of assignments and leave of absence and retirement occurred for about 1/3 of that original Task Group crew.
Six ships, an Air Wing along with 6000 sailors of the Harry S. Truman Carrier Strike Group deployed Friday from Norfolk Naval Station, Virginia.
They are the guided-missile cruiser USS Normandy (CG 60) and guided missile destroyers USS Winston S. Churchill(DDG 81), USS Oscar Austin(DDG 79) and USS Ross(DDG 71). The US force opposite Iran will be joined by a German warship, the frigate FGS Hessen(F221), operating under American command.
Enterprise is underway conducting carrier qualifications in preparation for work-ups and her 21st deployment.
On the West Coast, the carrier John C. Stennis on Monday started a $137 million, six-month planned incremental availability at Puget Sound Naval Shipyard in Bremerton, Wash. The carrier will have extensive work on propulsion and aircraft launch and recovery systems, according to the contract. Radar and communications systems also will be upgraded.
The carrier Ronald Reagan returned to sea for sea trials the following day after six months of upgrades, modernizations and maintenance. The work was done at Naval Air Station North Island, Calif., the carrier’s homeport.
And in the Western Pacific, the forward-deployed George Washington Carrier Strike Group departed Yokosuka, Japan, on Tuesday to conduct equipment testing and carrier landing qualifications to prepare for an upcoming deployment.
This comes after hundreds of thousands of man hours repairing and upgrading the carrier during a 121-day selective restricted availability period, according to the Navy.
Friday, May 21, 2010
USS Enterprise Out of Yard: InSurv Classified Documents?
Posted by
Westie99
at
3:13 PM
USS Ronald Reagan (CVN76) Now Beyond Accommodative
By Mass Communication Specialist 2nd Class (SW/AW) Torrey W. Lee, USS Ronald Reagan Public Affairs
May 21, 2010 - SAN DIEGO (NNS) -- USS Ronald Reagan (CVN 76) pulled into Naval Air Station North Island May 19 after a successful two-day sea trial, which marked the official end to its six-month planned incremental availability (PIA) period.
The sea trial was the final phase of PIA and was conducted to assess the material readiness and ability for the ship to return to the operational fleet.
Ronald Reagan's executive officer, Capt. Ronald Ravelo attributed the success of Ronald Reagan's PIA to the tremendous teamwork between the ship's crew and shipyard workers from Norfolk Naval Shipyard, Northrop-Grumman's Puget Sound Naval Shipyard, and Southwest Regional Maintenance Command.
"This is where a warship should be," said Ravelo. "I was walking around the ship and as we made it to deep water I could feel that energy in the crew."
During the maintenance period, Ronald Reagan received technological upgrades that will prepare it for its next deployment and beyond. Refurbishments ranged from hi-tech combat systems to firefighting equipment. The crew also benefited, receiving living spaces and improved ship's laundry services, to list a few.
"With the modernization we're now going through I think it serves as a preparation," said Ravelo. "The challenges out there in the real world are becoming a lot more complex. By investing the time and money into these carriers and upgrading the systems, it better prepares us to tackle all of those challenges."
Ronald Reagan's PIA began last fall, on the heels of the ship's fourth deployment in four years. The PIA was the ship's second, the first coming in 2007. With most of the crew involved in that maintenance period transferred, going from an operational carrier to a shipyard environment was difficult at first.
"Initially it was tough," said Ravelo. "After that initial shockwave once we got into the groove I think everyone worked really well together. Again, teamwork was the key."
Posted by
Westie99
at
1:51 PM
Wednesday, May 12, 2010
Above The High Seas Recommisioned for Action
As Rough As It May Seem,It's Still Steady As You Go...
At Rosyth, the massive 1,000-tonne crane needed to begin work on assembling the new Queen Elizabeth class aircraft carriers is now being manufactured and is due to arrive later this year, around August '10.
BAM Ritchies, installed pilings to support 1,000 ton capacity ‘Goliath’ gantry crane spanning 120m which will work over the length of the dock moving aircraft carrier sections into position.
The carrier build programme is worth £1 billion to Babcock, who will have 432 employees, including 140 apprentices, working on the ships in Rosyth.
After a nasty spill on the floor this blog is gearing up along side the massive under taking in and around the Babcock shipyard.
Last month two modules, making up the bulbous bow, were towed under the Forth bridges as they completed their journey from Babcock's ship yard at Appledore, Devon.
The blocks are the first two sub-blocks of the lower block one (LB01), which comprises the forward sections from the keel up to the flight deck.
LB01 consists of six sub-blocks (VB001-006), ranging in weight from around 112-339t.
The first two sub-blocks include the bulbous bow (VB001) and the bow section that sits above the second sub-block (VB002) comprising decks seven to five below the hangar deck.
The bulbous bow is the projecting 'bulb' at the bow of the ship, which alters the bow wave generation and water flow around the hull to reduce drag and increase the carrier's speed, fuel efficiency and stability.
VB001 is 30.3m long, 10.8m wide and 9.6m high, and weighs around 293t, while the second sub-block is 21.6m long, 17.4m wide and 6.2m high, and uses 112t of steel.
Both blocks will be joined together at Rosyth, including integration of electrical cabling, mechanical pipe systems, ventilation ducts and furniture.
The remaining sub-blocks (VB003-006) currently under construction at Appledore will be shipped to Rosyth in early 2011.
The 280m-long and 74m-wide HMS Queen Elizabeth and HMS Prince of Wales will have a displacement capacity of 65,000t.
Posted by
Westie99
at
8:53 PM
Friday, April 17, 2009
USS Mobile Bay (CG-53) and 3 other Navy Ships In Maintenance Trial
As Rough As It May Seem,It's Still Steady As You Go...
The life-cycle management activity will take its cues from a pilot program in which NavSea contracted with inspectors from the American Bureau of Shipping to determine the material age of four warships.
The destroyer USS Ross(DDG71), which was commissioned in 1997 has been inspected already. Although Navy officials hadn’t yet reviewed the report, they hope it will explain whether the ship has 12 years’ worth of aging and corrosion. Every cruiser and destroyer must serve for its full life of 35 years if the Navy is to reach its goal of a 313-ship fleet, officials say.
The other three ships in the trial program are the dock landing ship USS Germantown(LSD42) — which already has started its inspection — the cruiser USS Mobile Bay(CG53) and the frigate USS Taylor(FFG50). The Navy expects all four reports, which together will cost about $2 million, by this summer.
Posted by
Westie99
at
7:22 PM
Sunday, April 5, 2009
More Carrier Work for Scottish Yards in the Spring
Last month the consortium building the UK's two new aircraft carriers had announced a 50% increase in the amount of construction work coming to Scotland.
The Aircraft Carrier Alliance said two major sections of each ship, instead of one, would now be built at BVT's yards at Govan and Scotstoun on the Clyde.
Both ships will be built in sections and assembled at Rosyth, Fife.
The revised build strategy is expected to sustain 4,000 jobs at Scottish yards until the middle of the next decade.
The new 65,000 tonne carriers will be the Royal Navy's largest vessels.
Changes to the delivery of the £4bn contract were announced on Monday.
| Tony Graham MoD |
But the Aircraft Carrier Alliance (ACA) said existing and future workloads there had led to a lack of capacity to take on the additional carrier work.
In agreement with the Ministry of Defence (MoD), ACA has now transferred the work to BVT's yards in Glasgow.
Geoff Searle, programme director for the Queen Elizabeth Class aircraft carriers, said: "The ACA has developed a cost effective and low risk build strategy that I am confident will deliver the two carriers in line with the MoD's requirements.
"It will also ensure that we retain the essential core skills in the UK maritime industry to deliver sovereign naval capability long into the future."
'Confident future'
Tony Graham, head of capital ships at the MoD, said: "Alongside the developing build strategy, we are very pleased to announce additional shipbuilding work for the Queen Elizabeth Class carriers which further extends involvement across the UK.
"This provides greater certainty for our supplier base and keeps the project on a sure footing as we enter full-scale manufacture."
The SNP welcomed the increase in the amount of work awarded to Scotland.
The party's Westminster leader and defence spokesperson, Angus Robertson MP, said: "This is terrific news for the workforce in Glasgow and Rosyth and reinforces the reputation of Scottish yards as the best in the world.
"Shipbuilding plays an important role within Scotland's manufacturing base, and it is clear that the industry can have a confident future."
Labour accused the SNP of hypocrisy.
John Robertson MP said: "This is brilliant news for Glasgow and Scotland. It will mean more opportunities and more jobs for young people and older workers alike.
| Willie Rennie MP Lib Dem defence spoksperson |
"It is totally hypocritical for the SNP to welcome a move like this, when their core policy - separating Scotland from the rest of the UK - would mean the death of these jobs."
He added: "Without the United Kingdom, there would be no defence work on the Clyde.
"The SNP should have the decency to be honest with people about what their plans would mean for Scots."
The Liberal Democrats reiterated that view. The party's defence spokesperson, Willie Rennie MP, said: "If the SNP had their way, these jobs would be heading down south.
"Independence would decimate the Clyde."
Last year, the government announced that there would be a delay on the carrier contracts following a review of MoD spending.
The vessels, HMS Queen Elizabeth and HMS Prince of Wales, were due to enter service in 2014 and 2016, but that will now be pushed back a year or two.
Contracts were signed in July 2008 and the work is expected to begin in spring 2009.The future Aircraft Carriers for the Royal Navy, HMS Queen Elizabeth and HMS Prince of Wales, will be the largest and most powerful surface warships ever built in the UK.
They will displace approximately 65,000 tonnes, a size between the USA's 100,000 tonne Nimitz class and the French 43,000 tonne Charles de Gaulle class aircraft carriers, and three times larger than the Invincible class carriers.
The carrier will have a maximum speed of 25 knots. At 15 knots the range will be 10,000 nautical miles and the ship carries food, fuel and stores for an endurance of seven days between replenishments. Each ship will have a complement of typically 1,200, including 600 aircrew.
In order to maximise the flexibility that CVF can offer over its potential 50 year service life, the carriers will be built to an innovative adaptable design. Although CV-based, the ships will initially be fitted with a ramp for STOVL operations. Post JSF, the design will be capable of modification to operate aircraft requiring a catapult launch and arrested recovery.
Posted by
Westie99
at
10:46 AM

